Hotel wardrobe hardware should match the door design, available room space, expected use, and maintenance plan. Review the complete assembly, including fixings and access, before approving production.
Start with the door arrangement
Check whether hinged doors can open without hitting the bed, luggage, or bathroom door. Sliding doors can reduce swing space, but the track and overlapping panels affect how much of the wardrobe can be accessed at once.
Compare hardware options
| Component | Planning question | Maintenance check |
|---|---|---|
| Hinges | Does the door have enough opening clearance? | Adjustment and replacement access |
| Sliding track | Can guests reach the required storage? | Cleaning and roller replacement |
| Handles | Are they easy to grip and clean? | Secure fixing and finish wear |
Coordinate construction
Confirm door dimensions and weight with the hardware supplier. Review the mounting method, reinforcement, and alignment details in the shop drawings. Specify handles and finishes consistently across room types, while noting any site-specific variations.
Test daily use
Open the sample repeatedly, check door alignment, and ask housekeeping to clean around tracks and corners. Test access to hanging space, shelves, and the safe if one is included. Record any changes in the approved drawing.
Plan spare parts
Agree which hinges, rollers, handles, and fixings should be retained for maintenance. Keep the product references and supplier contact with the handover documents. The quantity should reflect the project and operator’s maintenance approach.
Illustrative example
In a fictional hotel, a mock-up shows that a sliding panel prevents easy access to a safe. The layout is revised before repeat production. This scenario is fictional.
Delivery planning
Custom furniture may take 15–45 days depending on the design, materials, quantities, and approval process. Confirm the actual project schedule with Simple Century.
Frequently asked questions
Are sliding doors always better for small rooms?
They save swing space but require careful consideration of track maintenance and access to the wardrobe interior.
What should be included in the handover?
Provide approved drawings, hardware references, adjustment instructions, and the agreed spare-parts list.
When should hardware be finalized?
Confirm it with the door dimensions, construction, and mock-up before production approval.